Projects

Select Projects

True North Mine (Manitoba, Canada)

Drift and stope stability analysis
Ground control plan
Underground Assessment
MX GoldWilla Mine (British Columbia, Canada) 

Permitting support for a underground bulk sampling program
Geotechnical site investigation and assessment of surface infrastructures
Ore pad design and construction planning
Quartz CreekVarious Gemstone Projects (British Columbia, Canada)

Technical support for quarry development and operation
Advice on contract negotiation and drafting
XimenBrett Gold Project (British Columbia, Canada)

Underground mine design and planning
Reclamation and closure planning

Treasure Mountain Property (British Columbia, Canada)

Exploration program planning
Permitting for exploration activities including drilling and trenching
Dease LakeNephrite Jade Project (British Columbia, Canada)

Ore modeling and resource estimation
Quarry design and equipment sizing
Financial modeling and analysis
AlexcoVarious Projects in Keno Hill District (Yukon, Canada)

Underground mine planning for a cut and fill operation
Valuation of mineral deposits in the Keno Hill district
RiversidePeñoles Project (Durango State, Mexico)

Conceptual underground mine design for the Jesus Maria deposit
Scoping study for the El Capitan deposit including resource modeling, pit optimization and design, and financial modeling and analysis
Mine Capital
Technical due diligence on precious metals and industrial mineral properties
Financial modeling and valuation on mineral asset acquisitions
AngloAmericanTrend Mine (British Columbia, Canada)

Sedimentation pond dam inspection
Tailings dam safety inspection and review (DSI/DSR)
Geotechnical investigation and review
Yukon First Nation
Trained members of Yukon First Nation Development Corps in mineral asset valuation
City of BurnabyTrans Mountain Expansion Project (British Columbia, Canada)

Geotechnical review of Burnaby Terminal Tank Facility
Geotechnical review of proposed Westridge Marine Terminal
Kitsault Molybdenum Project (British Columbia, Canada) — Pre-Feasibility Study

Production scheduling and financial modeling
Concentrate market analysis
Project risk analysis
NI 43-101 technical report preparation
BluePearl-Davidson Mill Project (British Columbia, Canada)

Financial model development and audit
Product market analysis
NI 43-101 technical report preparation
Minago Project (British Columbia, Canada) — Feasibility Study

Financial model audit
Project risk analysis
NI 43-101 technical report preparation
Afton-Ajax Project (British Columbia, Canada) — Feasibility Study — Open Pit Copper, Gold

Financial model development and audit
Product market analysis
Project risk analysis
NI 43-101 technical report preparation
picture-23428Morrison Project  (British Columbia, Canada) — Feasibility Study — Open Pit Copper, Gold

Financial model development and audit
Product market analysis
Project risk analysis
NI 43-101 technical report preparation
Mactung Project (Yukon, Canada) — Feasibility Study — Underground Tungsten

Equipment and personnel requirement estimation
Material handling trade-off study
Underground mine design and rock mechanics
Underground ventilation design, fan selection, ventilation controls, and power specification
Capital and operating cost estimate
Financial modeling and analysis
NI 43-101 report preparation
Pitarrilla Project (Mexico) — Pre-Feasibility Study — Underground Silver, Zinc, Lead

Equipment and personnel requirement estimation
Underground ventilation design, fan selection, ventilation controls, and power specification
Capital and operating cost estimate
Financial modeling and analysis
Product market analysis
Project risk analysis
NI 43-101 report preparation
Penasquito Project (Mexico) — Scoping Study — Underground Silver, Zinc, Lead

Financial modeling and analysis
Product market analysis
Project risk analysis
NI 43-101 report preparation
Berg Project (British Columbia, Canada) — Scoping Study — Open Pit Copper, Gold, Silver, Molybdenum

Sustaining capital estimation
Financial modeling and analysis
Product market analysis
Project risk analysis
NI 43-101 report preparation